Choke Manifold
1. Application
Choke manifold is necessary device to control the well kick
successfully and execute the pressure control technology on oil/gas
well in the course of drilling, as it is, the device is adopted to
execute new drilling-well’s technique of balance pressure, which
can prevent the pollution of oil-layer, improve the speed of
drilling and control blowout effectively. One end of the devicecon
nects with the side flange of BOP spool. When BOP closes, it can
control the finite pressure from casing by adjusting the choke
valve’s opening, so balanced drilling can work under minimum
pressure-difference.
2. Assembly & structure
Choke manifold consists of choke valve, gate valve, pipeline,
fittings and pressure gauge etc.
3. Working principle
When the pressure rising in well, fluid in well can be released in
utilization of the choke valve opening/closing in choke manifold to
control casing pressure, which can directly blow out through gate
valve as the casing pressure is quite high.
4. Specification
Pressure level is divided into five levels, i.e. 2,000psi,
3,000psi, 5,000psi, 10,000psi, 15,000psi; it can be designed
according to the requirement of customer.
5. Operation requirement
(1)All the working pressures of parts in choke manifold should be
matched with the working pressure of the BOP stack used
(2)Choke manifold should be installed at the place where operator
approach it conveniently, pressure test should be executed as
installation, while the sealing test pressure should equal to the
rated working pressure;
(3)Pipeline should be so smooth and straight as possible, the
corner of the pipeline should be made of 120°shaped forged steel
bent pipe, which should have adequately large bore.
(4)The working pressure gauge should be installed.
(5) In winter, the choke manifold be able to work under a low temp
condition.

